U.S. Courthouse/Post Office/Custom House – Renovations (112)
Renovations and Modifications at the U. S. Post Office/Courthouse/Custom House in Key West, Florida consisted of the demolition of an existing post office facility and other office spaces on the first floor of the U. S. Post Office/Courthouse/Custom House. This demolition made way for the addition of a complete court facility and U.S. Marshal’s service.…
Read MoreDistrict Courthouse – Renovation (107)
Judges suite and District Courtroom in Jackson, Mississippi consisted of a vacated post office area that Carmon Construction, Inc. demoed back to a bare structure. Then a new Judge’s suite with district courtroom was built. CCI built the judge’s suite and district courtroom from white oak trim and paneling. The courtroom also had part of…
Read MoreJudge Isaac C. Parker Federal Building and Courthouse – Courtroom Renovation (105)
The ISA for courts at the Judge Isaac C. Parker Federal Building and Courthouse at Ft. Smith, Arkansas began with the demolition of one-half of the second floor, which would become a new courtroom, judge’s chambers, library, clerk’s office and secretary offices. The court suite was finished in American Black Walnut with sequenced matched paneling…
Read MoreJ.W. Solomon Federal Building & Courthouse (102)
The courtroom renovation at the Federal Courthouse in Chattanooga, Tennessee was Carmon Construction’s first of many court projects. This project consisted of the demolition of all finishes from an existing post office area and building a complete courtroom with judge’s chambers including offices for secretaries, law clerks and a complete law library. The courtroom and…
Read More155 Air Traffic Control Tower-Birmingham, AL
The work included, but was not limited to, construction of Airport Traffic Control Tower (ATCT) with 180-foot tower shaft and steel frame glass enclosed cab; 12,000 square foot Base Building and 1,500 square foot Environmental Support Unit (ESU) Building. There were cassions and formed in place walls for the tower foundation. The base building and…
Read More224 ALARNG Fort McClellan Transient Training Barracks, Anniston AL
Project: Ft. McClellan Transient Training Enlisted Barracks Contact: Larry Crawley Phone: (334) 271-7464 This project consists of demolition, new Construction, and extensive site work. The demolition included thirty existing structures, including asbestos containing material removal. The new construction included 3 two-story buildings, 2 one-story buildings, 2 dining facilities, 2 supply administration buildings, 1 battalion headquarters building, and relocation…
Read More221 Albertville Recreation Center and Amphitheatre, Albertville Al
Contact: Mike Brewer Phone: (256) 673-7088 Email: mbrewer@cityofalbertville.com This project consists of separate areas at the Sand Mountain Parks. The Recreation Center is approximately 80,000 square feet. The gymnasium and natatorium is a large pre-engineered metal building with structural steel framing for the second-floor area. The fitness and administration wing is a two-story structural building. There is an…
Read More218 Lee County Courthouse – Opelika, AL
This new annex and new west entrance buildings were an addition to the existing Lee County Courthouse. These buildings were a combined total of more than 37000 square foot additions for this beautiful historic courthouse. This courthouse is sitting on a three-acre site in the downtown historical district of Opelika Alabama. This site included the…
Read More186 Air Traffic Control Tower- Huntsville, AL
Project No. DTFAtO-05-C-00027 Owner: Federal Aviation Administration Address: ASOSS P.O. Box 20636 Atlanta, GA 30320 Telephone: 404/305-5791 Architect: Horlrompf Contracting Offlcer: Brenda Sullivan Original Contract: SJ3,149,399.00 Revised Contract: $14,221,398 (owner initiated change orders) This project was constructed on a Seven-acre site. It included layout, engineering and an extensive amount of site work prior to the beginning of…
Read MoreAlbertville City Schools – Cafeteria (191)
This project was a new fully modernized construction of a cafeteria for Albertville High School. This building consisted of 14,500 square feet of new space. Modern state of the art food service equipment was installed in the kitchen area with walk in coolers and freezers. This area also includes a spacious storage area for dry…