ALBERTVILLE HIGH SCHOOL BAND ROOM

By Carmon Construction Inc. / / Comments Off on ALBERTVILLE HIGH SCHOOL BAND ROOM

The overall scope of this project takes an aging multi-purpose coliseum and refurbishes it into a state-of-the-art High School Marching Band practice facility. Site demo included a slab from an old storage building, curbs and gutters, and sidewalks to allow for new concrete ramp to a new loading dock. The building demo included a built-in…

Read More
A picture of the inside of a room with a person sitting on it.

COLUMBIA HIGH SCHOOL CAMPUS IMPROVEMENTS

By Carmon Construction Inc. / / Comments Off on COLUMBIA HIGH SCHOOL CAMPUS IMPROVEMENTS

This project consists of five separate areas. An addition to the existing field house, a new football field house, a new baseball field house, a new guard shack and exterior upgrades to the existing main school house. We started with the site demolition including landscaping, curb and gutters, asphalt paving and appurtenances in preparation for…

Read More
A picture of the inside of a room with a person sitting on it.

Ft. McClellan Transient Training Enlisted Barracks

By Carmon Construction Inc. / / Comments Off on Ft. McClellan Transient Training Enlisted Barracks

Project: Ft. McClellan Transient Training Enlisted BarracksContact: Larry CrawleyPhone: 334/271-7464 Description:This project consists of demolition, new Construction, and extensive sitework. The demolition included thirty existing structures including asbestos containing material removal. The new construction included 3 two-story buildings, 2 one story buildings, 2 dining facilities, 2 supply administration buildings, 1 battalion headquarters building, and relocation…

Read More
A picture of the inside of a room with a person sitting on it.

CALHOUN COMMUNITY COLLEGE

By Carmon Construction Inc. / / Comments Off on CALHOUN COMMUNITY COLLEGE

This project began with asbestos abatement at exterior parapet walls. Complete exterior demolition followed and included; parking lots, curbs and gutters, landscape, concrete paving/ stairs/sidewalks/walls. Over 10,000 SF of EIFS, insulation, Metal siding, coping and canopies were removed. Existing footings from original construction were notched and modified to accept over 360 helical piers for foundation…

Read More
Splash pad with blue and green features.

Albertville Recreation Center and Amphitheater

By Carmon Construction Inc. / / Comments Off on Albertville Recreation Center and Amphitheater

Project: Albertville Recreation Center and AmphitheaterContact: Mike BrewerPhone: 256/673-7088Email: [email protected] Description:This project consists of separate areas at the Sand Mountain Parks. The Recreation Center is approximately 80,000 square feet. The gymnasium and natatorium is a large pre-engineered metal building with structural steel framing for the second-floor area. The fitness and administration wing is a two-story…

Read More
A picture of the inside of a room with a person sitting on it.

Fayette Restoration

By Carmon Construction Inc. / / Comments Off on Fayette Restoration

Renovation of the existing National Guard Armory which is located in Fayette Alabama, consisted of a major demolition and renovation of existing spaces. There were Asbestos containing materials that had to be abated and ACM clearances reached prior to the balance of demolition could take be achieved. Balance of demolition included vinyl composition flooring, all…

Read More
A historic brick courthouse with a clock tower.

Lee County Courthouse

By Carmon Construction Inc. / / Comments Off on Lee County Courthouse

A new Annex building and new West Entrance were an addition to the existing Lee County Courthouse. These buildings were a combined total of over 37,000 square feet in additions for this beautiful Historic courthouse. The courthouse is sitting on a three-acre site in the downtown Historical District of Opelika Alabama. Site work included the…

Read More
DeKalb County E-911 Complex sign.

Dekalb 911 Project

By Carmon Construction Inc. / / Comments Off on Dekalb 911 Project

The Project’s scope of work consisted of the new construction of a single-story building consisting of a total of 12,756 gross sq. ft.   The building consisted of office spaces, a multi-media and multi-purpose meeting room a dispatch room with included a raised floor system, and an entry lobby with Impact Rated Aluminum Storefronts and Entrances.…

Read More
Brick building with white columns and a sunny day.

A New Building for Citizens Bank and Trust (216)

By Carmon Construction Inc. / / Comments Off on A New Building for Citizens Bank and Trust (216)

Construction of the Citizens Bank & Trust in Guntersville, Alabama was unique in that it was started approximately 8 years earlier by another local bank and was abandoned in the early stages of structural development. Our initial task was to assess the existing concrete structure and modify it to accept the entirely new construction requirements…

Read More
A picture of the inside of a room with a person sitting on it.

CHALKVILLE ELEMENTARY SCHOOL

By Carmon Construction Inc. / / Comments Off on CHALKVILLE ELEMENTARY SCHOOL

Demo and replace all kitchen finishes and food service equipment. Expand and refurbish parking area with driveways and all associated appurtenances.

Read More