U.S. Federal Bureau of Prisons – Generator (168)

This project consisted of Replacement of three Emergency Generators used for back-up power for the United States Federal Bureau of Prisons in Atlanta, Georgia.

Three new 2,500 KW generators (only Caterpillar makes generators this large) including the fan plenum housing, muffler exhaust system and a 12,000 gallon fuel tank and fuel pump system to power the generators. Once the new generators were on-line, CCI had to take the existing generators off-line and have them refurbished.

Other trades included in this project were asbestos abatement, new interior masonry walls, metal roof, plastering, structural steel and painting.

Demo and removal of two underground fuel tanks was required with the required federal testing and closure reports.

Federal Bureau of Prisons Atlanta, Georgia
$3,561,830.04
400 sq ft
Completion date: May 2003

Posted in

Carmon Construction Inc.